PROJECT # - THE BEDROOM FLOOR VENT
BEFORE
This is another quick project. when the house had it's big remodel the previous owner filled in this vent hole with scrap wood, knowing it would be covered with carpet. Now that the floor is visible, it's time to fix it properly.
|
|
During
The scrap wood is taken out and the hole widened to cover the previous owner's 'work.'
|
|
After
The hole is filled in with both red and white oak, and will be stained to match the floor. |
|