PROJECT #16b - THE CHIMNEY INSTALL
During
The chimney is triple wall construction and required each wall of the chimney to be set into place whole. Each section was lowered into place from above and then set below.
Once in place, each of the inner walls was sealed with high temperature tape and a metal collar. Finally, the outer wall is in place. The only thing left to do: Install the new chimney cap on the top of the installed chimney. |